15th September 2019

Construction of the Gaushala has resumed after halt of about one month. In weeks time plinth level is expected to be completed. 

Construction of the Gaushala has resumed after halt of about one month. In weeks time plinth level is expected to be completed. 
5th September 2019
Construction of the final phase of the water tank at the Lakshmi Narayan Gaushala resumed from today.

Construction of the final phase of the water tank at the Lakshmi Narayan Gaushala resumed from today.

27th August 2019
Construction of water reserve tank at the Lakshmi Narayan Gaushala as on 27/08/2019. 70% work completed.


Construction of water reserve tank at the Lakshmi Narayan Gaushala as on 27/08/2019. 70% work completed.