29th January 2019
Dear Supporters,

Thank you all for your love and support shown towards our campaign.

The further money will be used to start the covering of the roof structure.
We are finishing up with the nut-bolts and nailing into the roof structure provide it strength, we will start covering the roof surfaces with the prepared bundles of thatch, we made previously, this process includes labours, technical team to plant glass-circular skylight into the roof to provide light while thatching.
With this we brought scrap stone for flooring mosaic, broken brick, we will start making the flooring. We have filled tyres around 200 right now, ready for making wall enclosure. This includes materials, labours and supervisions.

After this amount we will have the thatched roofing , ready for cement coating over it, a big part of tyre walls, toilet area, a part area interior flooring. This much I see in 20 days from the release of funds.

Afterwards we will be able to post first update on campaign page in 4-5 days for architectural model and building's thatched roof.
We do our best efforts to achieve maximum results possible in the funds provides .

Regards,
Ashwani
Dear Supporters,

Thank you all for your love and support shown towards our campaign.

The further money will be used to start the covering of the roof structure.
We are finishing up with the nut-bolts and nailing into the roof structure provide it strength, we will start covering the roof surfaces with the prepared bundles of thatch, we made previously, this process includes labours, technical team to plant glass-circular skylight into the roof to provide light while thatching.
With this we brought scrap stone for flooring mosaic, broken brick, we will start making the flooring. We have filled tyres around 200 right now, ready for making wall enclosure. This includes materials, labours and supervisions.

After this amount we will have the thatched roofing , ready for cement coating over it, a big part of tyre walls, toilet area, a part area interior flooring. This much I see in 20 days from the release of funds.

Afterwards we will be able to post first update on campaign page in 4-5 days for architectural model and building's thatched roof.
We do our best efforts to achieve maximum results possible in the funds provides .

Regards,
Ashwani
28th December 2018
Dear Supporters,

Thank you for your love. This project is a contemporary advancement to India architecture and schools in india. This campaign and building construction will need 150 days to finish.

We have a calculated estimations and bill of quantities, which reduce the required amount by 2.5lac rupees. Above documents will be uploaded soon.
Dear Supporters,

Thank you for your love. This project is a contemporary advancement to India architecture and schools in india. This campaign and building construction will need 150 days to finish.

We have a calculated estimations and bill of quantities, which reduce the required amount by 2.5lac rupees. Above documents will be uploaded soon.
5th December 2018
Dear Supporters,

We completed the structural part of the building
columns, roofing, mesh, sewage treatment rainwater harvesting,foundation for the structural walls, levels development,etc ,
above works have been done and running.
further we work on flooring, partitions, staircases, ramps and classroom slabs.

Dear Supporters,

We completed the structural part of the building
columns, roofing, mesh, sewage treatment rainwater harvesting,foundation for the structural walls, levels development,etc ,
above works have been done and running.
further we work on flooring, partitions, staircases, ramps and classroom slabs.